CSD Ingénieurs a développé une solution de production d’électricité photovoltaïque en partenariat avec un tiers investisseur. (photo : Serge Brison, recadrée).
CSD Ingénieurs a développé une solution de production d’électricité photovoltaïque en partenariat avec un tiers investisseur. (photo : Serge Brison, recadrée).

The recently completed Block 3 of the City Dox project in Anderlecht benefited from the expertise of CSD’s engineers. In addition to structural engineering, they developed the energy and environmental concept, including the building services and EPB requirements. A number of innovative solutions were implemented.

For the residential part of the block, a district heating network has been installed, supplied by mains gas and by a greywater heat recovery system. CSD Ingénieurs also developed a photovoltaic electricity generation solution in partnership with a third-party investor. All homes are equipped with mechanical ventilation with heat recovery. Half of the 90 homes built for Citydev are even energy-neutral.

The greywater recovery system, with heat recovery on the left and water treatment and storage for reuse on the right. (Photo: CSD Ingénieurs)

Rainwater attenuation

For rainwater recovery, the team opted for an original attenuation system using blue roofs, instead of an underground stormwater basin, which would have been very expensive because contaminated soil would have had to be removed. In addition, the sewer network was already close to capacity, so Vivaqua limited discharge rates to 1/100 of the normal rainfall flow rate… Rainfall of normal intensity therefore drains away very slowly, while overflow safety systems prevent excessive roof loads during exceptional downpours. The system also covers the garden in the middle of the block, landscaped above the podium containing the car parks and premises for productive activities (light industry, wholesale trade). 

To accommodate activities compatible with the ground-floor homes, CSD Ingénieurs carried out a study of the potential risks they could pose in terms of noise, air emissions and exhaust gases, as well as fire. CSD Ingénieurs also undertook the car park smoke control study.

Comfort in the offices is provided by a 4-pipe heat pump system, chilled ceilings and mechanical ventilation with heat recovery. The window design was studied to maximise natural light while limiting the risk of summer over-
heating.    

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectProjects
Share this article

Follow Installation & Construction

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.